Kilimanjaro

Welcome to my gallery

First-day-gate-to-forest-camp
Date Taken: 03/07/2010

First-day-gate-to-forest-camp

February 19, Day 1: Vehicle transfer from Arusha to Lemosho start gate (2,256m S3 00.166 E37 08.692). Trek to Mti Mkubwa Camp  (2,821m S2 59.791 E37 10.499)

Second-day-forest-camp-to-shira-1
Date Taken: 03/13/2010

Second-day-forest-camp-to-shira-1

February 20, Day 2 : Forest Camp (2,821m) to Shira 1 Camp (3,504m) – optional acclimatisation ascent to Shira Peak (3,959m)

Third day-shira peak to moir hut
Date Taken: 03/14/2010

Third day-shira peak to moir hut

Shira 1 Camp (3,504m) to Moir Hut (4,155m), excursion to lent group (roughly 4500m)

Fourth day-Moir Hut to Shira Cave
Date Taken: 03/14/2010

Fourth day-Moir Hut to Shira Cave

Moir Hut (4,155m) to Shira Cave (3,847m)

Fifth day-Shira Cave to Lava Tower
Date Taken: 03/14/2010

Fifth day-Shira Cave to Lava Tower

Shira Cave (3,847m) to Lava Tower (4,642m) (climb Lava Tower)

Sixth day-Lava Tower to Arrow Glacier Camp
Date Taken: 03/14/2010

Sixth day-Lava Tower to Arrow Glacier Camp

Day 6 : Lava Tower (4,642m) to Arrow Glacier Camp (4,871m) – optional acclimatisation excursions

Seventh day-Arrow Glacier Camp to Crater Floor
Date Taken: 03/14/2010

Seventh day-Arrow Glacier Camp to Crater Floor

Arrow Glacier Camp (4,871m) to Crater Floor (5,725m)

Eighth day-Uhuru Peak-Circumnavigate the Crater floor-Reusch Ash Pit-Stella Point-Barafu Camp-Mweka Camp
Date Taken: 03/14/2010

Eighth day-Uhuru Peak-Circumnavigate the Crater floor-Reusch Ash Pit-Stella Point-Barafu Camp-Mweka Camp

Uhuru Peak (5,895m)
Circumnavigate the Crater floor, and Reusch Ash Pit. Descend from Stella Point (5,752m) to Barafu Camp (4,681m) to Mweka Camp (3,090m)

Ninth day-Mweka Camp to Mweka Gate
Date Taken: 03/14/2010

Ninth day-Mweka Camp to Mweka Gate

Day 9 : Mweka Camp (3,090m) to Mweka Gate (1,641m). Vehicle transfer back to Arusha

  • 1
Powered by zenphoto